The time has come: The implementation begins and a newly developed system or technology is integrated into an existing network or hardware components are replaced.
Whether the network was previously planned by us or another Provider – our customers have the objective assurance that they can fully rely on us at any step of the implementation process. And therefore can take care of their main business.
Implementation with Profindis: Ready to Use and Safe
- Comprehensive project management from A to Z
- Implementation of externally planned networks or Profindis concepts
- For externally planned concepts: analysis and evaluation
- Verification of the concept (Proof of Concept)
- Detailed planning of the migration: time schedule and tuning of switching times
- Development of a migration strategy: Do temporary solutions have to be installed? Does the infrastructure have to be migrated without downtime? Which special-purpose solutions need to be observed (fire alarm systems, camera surveillance, legacy systems)?
- Preparation of implementation: installation, software updates, configuration preparation
- Verification of all required functions
- Full implementation acceptance tests: redundancy test, performance test
- Construction and integration of a network monitoring system
When should we implement? During the day, at night or on the weekend? We follow the procedures in the company and only leave as soon as everything works as planned. And: We see errors in concepts and problems in networks that others don’t. Because we have the bigger picture in mind – many successful implementations speak for themselves.
Contact us!

Profindis GmbH
Siemensstraße 23
76275 Ettlingen
Germany
T: (+49) 07243/9475800
F: (+49) 07243/9475807
E: info@profindis.de